OrbitGuard
14:32:00UTC

MNV-0904 · SL-8 R/B DEB

OG-3 Sentinel-A — cross-track burn, executed

Delta-v0.08m/s
Propellant0.001kg
Axiscross-track
Executed5d 2h ago
Statusexecuted

Burn performed. Post-burn state vector confirmed by tracking.

Effect on the event

Pc before1.2×10−4
Pc after3.1×10−7
Conjunction
CJ-4412 (cleared)
Spacecraft
OG-3 Sentinel-A
Secondary
SL-8 R/B DEB
Operator
A. Lindqvist

Propellant cost

This burn0.001kg
Remaining3.41kg
SK runway6.5yr
3.410 kg after burnreserve 0.8 · capacity 5.0 kg

Already drawn down — the remaining figure above is post-burn.

Orbit response

Gauss variational · Clohessy–Wiltshire
Δ semi-major axis0m
Δ period0.000s
Δ inclination6.0e-4deg

A cross-track burn rotates the orbit plane rather than changing the period, so separation appears immediately at the burn point rather than accumulating.

Propulsion

Tsiolkovsky
Specific impulse1600s
Thrust0.011N
Vehicle mass208.4kg
Propellant0.0011kg
Burn duration1516s
Mass fraction5.1e-6
System
Xenon Hall-effect thruster
Δv capability remaining
197.7 m/s
Avoidance burns of this size left
2,455

Low-thrust system — the burn spans a meaningful fraction of an orbit, so it is modelled as finite rather than impulsive and the achieved delta-v is direction-averaged.

Downstream conjunctions

not modelled

No downstream screening on file for this burn. Historical burns retain their record but not the re-screening that followed.